WHERE WE WORK 🇱🇰Sri Lanka▾ 🇲🇻Maldives 🇧🇩Bangladesh
Free engineer-grade tool Branded PDF report

Generator Sizing Calculator Sri Lanka.

Estimate generator kVA from HVAC, pumps, lifts, lighting and process loads, including starting current and tropical derating. View results and download a PDF report.

11 load categories Starting current method Tropical 40°C derating Branded PDF output

1Project & Building

Pick a building type to seed defaults. You can edit everything afterwards.

2HVAC — Air Conditioning

Split AC, VRF outdoor units, chillers, AHUs, FCU motors. Use the building heat-load calculator if you don't yet know the cooling capacity. Heat-load calculator →

DescriptionkWQtyStartingDiversity

3Pumps & Motors

Water transfer, booster, fire (jockey + main), sewage, HVAC chilled-water and condenser pumps, cooling-tower fans. Starting type matters: Direct-on-Line motors draw 6× their rated current at start.

DescriptionkWQtyStartingDiversity

4Lifts & Vertical Transport

Passenger lifts, service lifts, escalators, dumb-waiters. Modern VVVF lifts are gentler on starting current than older AC two-speed.

DescriptionkWQtyStartingDiversity

5Lighting & General Power Outlets

Add total lighting and socket-outlet load. As a guide: offices ~12 W/m² lighting, hotels ~15 W/m², factories ~10 W/m². Sockets typically diversify to 30-50%.

DescriptionkWQtyStartingDiversity

6Kitchen Equipment

Hotels, hospitals, restaurants. Combi ovens, walk-in coolers, induction hobs, dishwashers, exhaust fans. Diversity is high in commercial kitchens — typically 40-60% running simultaneously at peak.

DescriptionkWQtyStartingDiversity

7Laundry Equipment

Industrial washers, dryers, irons, calenders, finishers. Hotels and hospitals only. Dryers are heavy continuous loads; washers have brief inrush.

DescriptionkWQtyStartingDiversity

8Medical Equipment

Hospital backup loads — OT lights, ICU, ventilators, MRI, CT, X-ray, dialysis, autoclaves, lab refrigeration. Critical loads must always be 100% backed up.

DescriptionkWQtyStartingDiversity

9Industrial / Process Machinery

Factory motors, compressors, conveyors, mixers, presses, CNC machines. Use VFD wherever possible — cuts starting current to ~1.2×.

DescriptionkWQtyStartingDiversity

10IT & UPS Systems

UPS systems, server rooms, data halls. UPS adds an inrush surge on start (~4× rated kVA briefly). For data centres, consider 2N redundancy.

DescriptionkWQtyStartingDiversity

11EV Chargers

Increasingly common for hotels and offices. AC chargers (7-22 kW) are continuous loads; DC fast chargers (50-150 kW) need careful generator sizing.

DescriptionkWQtyStartingDiversity

12Other Loads

Anything else — pool pumps, garden lighting, fountains, signage, water features, future expansion allowance.

DescriptionkWQtyStartingDiversity
Engineering disclaimer. This calculator gives a sized indication based on standard Sri Lankan industry practice (CIBSE / IEC / NFPA reference, 40°C ambient, 0.8 PF, 20% margin). Final selection must be reviewed by a qualified electrical engineer who has visited the site and inspected the actual load profile, single-line diagram and starting sequence. NativeWay's engineers will validate this calculation as part of any quotation.

Why starting current matters

A motor at start draws 4–7× its rated current. The genset must handle this surge without voltage drop greater than 15%, or the motor stalls.

Why tropical derating

Sri Lankan ambient is 35°C; gensets are rated at 25°C ISO. Derate ~5% for cooling efficiency loss in tropical conditions.

Why diversity factor

Not every load runs simultaneously. Hotels run ~70% of HVAC at peak; factories run ~80% of motors. Apply realistic diversity per category.

Beyond this calculator

Final sizing should account for harmonics, future expansion, parallel operation needs, and the actual single-line diagram. Talk to our power engineers.