WHERE WE WORK 🇱🇰Sri Lanka 🇲🇻Maldives 🇧🇩Bangladesh▾
DIESEL GENERATORS · BANGLADESH

Diesel Generators in Bangladesh.

Standby and prime power for factories that cannot stop. Sized against the real load — including the chiller plant — installed, commissioned and maintained by the same Dhaka team.

Request a site visit +880 178 702 9750

The generator is usually sized before the cooling is designed. That is the mistake.

A 300 TR chiller plant needs generator capacity that accounts for both running load and starting demand. Check the current load schedule before specifying the set.

NativeWay sizes the generator and the cooling together because we install both. Step loads, starting method, transformer capacity and the UPS for controls are one calculation, not three quotations from three suppliers.

What we supply in Bangladesh.

What a complete generator quotation should show.

The connected load and how it was measured. Step loads and starting method. kVA at site conditions, not at ISO standard. Fuel consumption at 50, 75 and 100 per cent. The changeover panel and its logic. Cable sizes and routes. The civil work for the base and the fuel store. Exhaust routing and noise at the boundary. Commissioning and load-bank testing. Warranty, and who honours it in Dhaka.

If it is a model number and a price, it is not a quotation.

Common questions

What Bangladeshi buyers ask us first.

What size generator does an RMG factory need?

It depends on the connected load and what must keep running. A factory that only needs lighting, machines and offices through an outage is a different number from one carrying the full chiller plant. We measure the load on site at your busiest hour and size from that, not from the sanctioned load on the electricity bill.

Standby or prime power in Bangladesh?

If the grid is reliable and outages are short, standby. If your plant runs hours a day on generator, the set needs a prime-rated engine and a different maintenance regime — running a standby-rated set as prime power is how engines get destroyed inside two years.

Do you handle the transformer and MV side?

Yes. Transformers, MV and LV distribution, changeover panels, cabling and controls are part of the same scope, by the same team installing the generator. That is the whole point.

What about maintenance?

An AMC covering scheduled servicing, load-bank testing and emergency callout, with genuine parts held in Dhaka. A generator that has not been tested under load is an assumption, not a backup.

Tell us the building. We’ll come back with a real number.

A NativeWay engineer replies — not a call centre. Free site survey across Bangladesh.

Request a free site survey